|
Planning Materials
The comprehensive community plan will be drafted using various sources of information. Because this planning process is an effort to update the existing comprehensive community plan, the existing plan is very important. The existing plan can be downloaded here as Plan, Part 1 (61 MB PDF) and Plan, Part 2 (75 MB PDF).
Conceptual Renderings
Several conceptual renderings have been completed for gateway signage, lighting, banners, public places, community markers and logos. Please use the links below to view the related information in PDF and JPEG formats.
Concepts
Concepts 1
Concepts 2
Concepts 3
Concepts 4
Gateways
Gateway Study 1
Gateway Study 2
Gateway Study 3
Gateway Signage 1
Gateway Signage 2
Gateway Signage 3
Gateway Pillars Study
Gateway Tower
Lighting
Lighting 1
Public Places
Public Places 1
Public Places 2
Community Markers
Community Markers 1
Landmark Design
Logos
Round 1
Round 2 Logo 1
Round 2 Logo 2
Round 2 Logo 3
Round 2 Logo 4
Round 2 Logo 5
Round 2 Logo 6
Round 2 Logo 7
Logo Studies, Refined
Logo Studies, Refined, Round 2
February 2009 Logo Revisions
Pre Production Final Identity Designs for Howland Township
Final Logo Design
Comprehensive Community Master Plan Materials
Comprehensive Community Master Plan Draft (March 2010)
Comprehensive Community Master Plan Draft (October 2009)
|